Pilgrim Green

Circular Plastics Infrastructure · Slovakia

Pilgrim Green is developing a commissioning-stage plastic pyrolysis facility in Slovakia. The project is designed to receive mixed, difficult-to-recycle plastic streams and convert them into recovered hydrocarbon products, carbon-rich material and process gas.

Project Overview

Mechanical recycling works best with clean and well-separated material. Pilgrim Green is aimed at the more difficult part of the waste stream: mixed and contaminated plastics that often have few practical recovery routes. The facility uses oxygen-limited thermal conversion to separate this material into useful outputs.

The immediate objective is straightforward: complete the plant systems, commission the line, confirm product quality and establish a stable operating record.

How the Facility Works

Feedstock Preparation

Incoming plastic is reduced to a workable size and screened before entering the conversion system.

Thermal Conversion

The prepared material is heated without normal combustion, breaking long polymer chains into smaller hydrocarbon fractions.

Product Recovery

Condensation and separation systems recover liquid hydrocarbon products and carbon-rich solid material.

Internal Energy Loop

Process gas is intended for use within the facility, reducing reliance on externally supplied energy once operations stabilise.

Commercial Model

The proposed model combines payment for accepting difficult waste, sales of recovered outputs and operating savings from internal process gas. Each part must be supported by contracts, product testing and operating evidence during due diligence and commissioning.

Waste Intake

Waste suppliers may pay a gate fee for a reliable processing route, subject to the final feedstock specification and executed supply arrangements.

Recovered Products

Liquid and solid outputs can serve industrial markets when they meet buyer specifications and applicable regulatory requirements.

Operating Efficiency

Internal use of process gas is intended to lower external energy requirements and improve the plant’s operating economics.

Commissioning Path

  • Complete critical systems: finish the mechanical, pressure, storage, separation, gas-handling and site works needed for safe operation.
  • Integrate and test: run the complete process under controlled conditions and confirm that all units work together.
  • Validate products: test recovered outputs against buyer specifications and document repeatable quality.
  • Stabilise operations: build a record of throughput, yield, downtime, energy use and operating cost before pursuing replication.

Why Slovakia

Industrial Location

Slovakia combines European Union market access with an established industrial base, regional transport links and a comparatively practical operating-cost environment.

Platform Potential

A successfully commissioned plant can provide the technical, commercial and governance record needed to evaluate similar projects in other European markets.

Due-Diligence Priorities

The public page describes the project. Investment decisions require a separate evidence layer. MidLincoln’s capital-architecture work is focused on making that layer clear and reviewable.

Asset and Engineering

  • Equipment ownership and independent inspection
  • Site readiness and completion schedule
  • Trial data, yields and energy balance

Commercial Evidence

  • Feedstock availability and gate-fee terms
  • Product specifications and laboratory results
  • Buyer commitments and logistics

Legal and Governance

  • Permits and environmental compliance
  • Cap table and investor rights
  • Use-of-funds controls and reporting

Key Risks

Commissioning Risk

Integrated industrial systems may require additional work, time or capital before they reach stable commercial output.

Product and Market Risk

Yield, product quality, buyer acceptance and realised pricing must be demonstrated through repeatable operations and binding agreements.

Regulatory and HSE Risk

Waste handling, emissions, pressure systems, storage and product classification require careful legal, environmental and safety review.

Investor Fit

The project may suit investors familiar with commissioning-stage industrial assets, circular infrastructure, waste processing and special situations. The relevant investor brings patience for technical diligence, understands operating risk and values clear governance around the use of capital.